Features, discussions, tips, tricks, questions, problems and feedback

Melsec-Q Q61LD Load Cell two-point calibration connected to Melsec iQ-R via GX Works3

Melsec-Q Q61LD Load Cell two-point calibration connected to Melsec iQ-R via GX Works3

Background
In this article, we will be looking at the Melsec-Q Q61LD Load Cell two-point calibration connected to Melsec iQ-R via GX Works3.

Introduction
Traditionally, the Q61LD is being connected to a Melsec-Q CPU - and thus - the Q61LD two-point calibration process follows per the applicable manual.

However, what happens if the Q61LD is connected to a Melsec iQ-R CPU, Programmed via GX Works3?

Q61LD Two-Point Calibration Setting
The Q61LD Two-Point Calibration Setting can be found as follows:

Reference information:
Load Cell Input Module User’s Manual http://suport.siriustrading.ro/02.DocArh/01.PLC/03.Modulare/06.MELSEC%20Q/07.Alte%20module%20speciale/Q61LD%20-%20User’s%20Manual%20SH(NA)-080821-D%20(02.16).pdf
ch.4. p.55

1 Like